Tulare Complete Streets 6th Street Cedar Avenue
BID DATE
09/5/23 - 3:00
AGENCY
Fresno
ESTIMATE
n/a
SCOPE
The scope of work includes but is not limited to; Removal of existing asphalt and replacing with new hot mix asphalt and construction of ADA complaint curb ramps, sidewalk, streetlights, slurry seal, signing and striping. The scope also includes installation of FMFCD storm drain facilities. https://pbsystem.planetbids.com/portal/14769/bo/bo-detail/107202 Sherri Cuadros 559-621-1151 sherri.cuadros@fresno.gov