Access the Full Project by Clicking here!
Bidjugde
JOB
Lakeview Avenue Street Improvements Eisenhower Circle
BID DATE
01/22/15 - 2:00
AGENCY
Anaheim
ESTIMATE
$336,700
SCOPE
The work to be undertaken consists of excavation and construction of asphalt concrete pavement and base materials. The work also includes clearing and grubbing, construction of concrete sidewalk, curb and gutter, concrete driveways, storm drain, irrigation improvements, new water service and meter, sewer lateral, adjustments and coordination of adjustment of manhole covers, water valve covers, coordination of adjustment and removal of utility structures with utility purveyor; preservation and replacement of survey monuments, replacement of traffic striping, traffic loops, traffic signs and pavement markings, and all appurtenant work thereto necessary for the proper construction of the proposed improvements, in accordance with plans, specifications and contract documents. The street and sidewalk is being constructed for pedestrian safety, to transition to the newly acquired portion to the east and transition joining the proposed Lakeview Grade Separation to the north.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT