Access the Full Project by Clicking here!
Bidjugde
JOB
TCC Park MLK Magnet Core
BID DATE
09/19/23 - 3:00
AGENCY
Fresno
ESTIMATE
n/a
SCOPE
The scope of work includes but is not limited to; the construction and development of a ten-acre park and a public street. The new ten-acre park will be located in the center of a planned mixed-use development adjacent to the new West Fresno Satellite Campus (CCI Project #18), on the west side of MLK Jr. Boulevard Between Church and Jensen Avenues. The park design consists of the installation of drought tolerant planting, perimeter bioswales, 100 trees, walking paths, reclaimed water irrigation, a modular restroom, a themed playground, utilities, infrastructure, site furnishing, and LED park lighting. The public street includes but is not limited to the construction of a perimeter loop road (West Creek Village Way), which extends off of Church Avenue. The roadway construction consists of site utilities, drainage, sidewalks, street lighting, curb and gutter. https://pbsystem.planetbids.com/portal/14769/bo/bo-detail/107020 Rafael Hanjiev 559-621-8361 rafael.hanjiev@fresno.gov
UPDATES