(CMAR) Westwood St Water Main Improvements Sidewalk Signal Recon
BID DATE
10/5/23 - 9:00
AGENCY
Mesa
ESTIMATE
$4,000,000
SCOPE
SHORTS: 8/28/23 The purpose of this project is the installation of new 8-inch to 12-inch ductile-iron water mains, a water main loop at Carson Jr. High School, a 2-inch polyethylene gas main, along with raised crosswalks and signal reconstruction located in Westwood and 6th Street. The project boundaries are defined as follows: On Westwood from North of University Drive, South of Rio Salado Parkway, and on 6th Street between Extension Road and Country Club Drive. The selected CMAR will be tasked with installing new water mains, gas mains, service connections, raised crosswalks and signal reconstruction, utility coordination, school programing coordination, and traffic control. The existing water and gas mains will be abandoned. Water and gas scope will encompass new water mains, new water valves, fire hydrants, service lines, air release valves, and water meter boxes for water improvements, new gas valves, and service lines for gas. Utility coordination as needed. Tracy.Gumeringer@mesaaz.gov
UPDATES