Access the Full Project by Clicking here!
Bidjugde
JOB
2023 Storm Drain Improvements Purissima Park Story Hill Lane Oak Park Court
BID DATE
06/15/23 - 2:00
AGENCY
Los Altos
ESTIMATE
$160,000
SCOPE
This project consists of constructing a new bio-retention basin, installing new drainage pipes, and drainage inlets at Purissima Park, installing a new drainage inlet and pipe in an existing siltation basin near Story Hill Lane, and improving an existing drainage basin near Oak Park Court. The work includes, but not limited to, mobilization and demobilization; potholing all crossing utilities; repair and/or replacement of pavement marking,; restoring all improvements disturbed by the project at various locations throughout the Town of Los Altos Hills; replacing landscape in kind to the original condition; replacing the asphalt pavement, and replacing all damaged properties caused by this work; and doing all appurtenant work as shown and described in the contract documents. The Engineer’s Estimate for this project is $160,000. dliang@losaltoshills.ca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT