Access the Full Project by Clicking here!
Bidjugde
JOB
Clay Second Street Sidewalk Drainage Improvements From Collins Road Lake Richmond
BID DATE
07/13/23 - 2:00
AGENCY
Fort Bend County
ESTIMATE
n/a
SCOPE
The project consists of the following major storm sewer and paving work items: Construction of an approximately 4800 LF reinforced concrete box storm sewer system ranging in size from 5’ x 4’ to 9’ x 7’ complete with inlets and manholes, widening of Clay Street to a 27-foot wide reinforced concrete roadway from Collins to Tenth Street, and from approximately 500 feet east of Tenth Street to Second Street, milling and asphalt overlay of Clay Street from just east of Tenth Street to approximately 500 feet east of Tenth Street, and widening of Second Street to a 27-foot wide reinforced concrete roadway from Clay Street to just south of Commerce Street, and construction of an 8-ft concrete shared use trail on the north side of Clay Street and a 5-ft sidewalk on the south side of Clay Street that continue along Second Street for the length of the project. The project will also include installation of ornamental light standards with associated power drops, underground conduit & pull boxes. The construction activities will require implementation of Storm Water Pollution Prevention Plan (SWPPP) and Traffic Control Plan as indicated on plans. https://www.civcastusa.com/project/647f9364e933378cbd450d2f/summary
PREBID
6/29/2023 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT