SCOPE
The project consists of repairing 5.49 miles of Beasore Road on the Sierra National Forest, California. Work shall include but is not limited to cleaning and reconditioning the culverts along the road, replacing 600 linear feet of 36” corrugated metal pipe, installing metal end sections, and installing a metal spillway. Work will also include the 6 inches full depth reclamation from mile post 24.14 to 29.63, installing a geogrid Tensar TriAx TX7 or equivalent (Optional item), grading & compacting the pulverized material, importing & placing base rock to correct lower areas, placing rip rap on outlets and ditches, placing a 4” layer of hot mix asphalt and painting two coats of a double yellow center line. catherine.whitted@usda.gov https://sam.gov/opp/e193cde532024d7ba46b9194d3ebe143/view