Access the Full Project by Clicking here!
Bidjugde
JOB
Big Park Wastewater Treatment Plant UV Replacement
BID DATE
07/21/23 - 11:00
AGENCY
Big Park Domestic Wastewater ID
ESTIMATE
$687,782
SCOPE
This project is located within the Big Park Wastewater Treatment Plant (WWTP) at 100 Hutson Ln, Sedona, AZ 86351. It consists of replacement of the existing traditional UV Disinfection System with ENAQUA Non-Contact UV system with all the piping, concrete pad, deck drain, fittings, joints, bolts, and other accessories, plug valves, valve boxes and covers, air release valves, PROMAG flowmeter and vault, ROMAC RFCA, pipe support, special coating and painting, electrical accessories, Rock retaining wall, and an additional building for the new UV system, according to the provided engineering plans, specifications and special revisions. The Enaqua NonContact UV System has been previously purchased directly from Enaqua and will be delivered to the WWTP site by the manufacturer. ddirren@sunrise-eng.com https://planroom.sunrise-eng.com/#projects/361450/details
UPDATES