Access the Full Project by Clicking here!
Bidjugde
JOB
Rwrd Raw Water Transmission Mains
BID DATE
07/21/23 - 3:00
AGENCY
Bowie County
ESTIMATE
n/a
SCOPE
This project consists of the transmission pipeline portions of the Riverbend Water Resources District (RWRD) Regional Water System Improvements Program (RWSIP) on Wright Patman Lake that will provide raw and treated water to RWRD customers including member cities, the TexAmericas Center (TAC) Industrial Park and the Red River Army Depot (RRAD). The RWP will conduct flow from the Raw Water Pumping Station (RWPS) to the WTP along a route that is roughly 7 miles long. Treated water will be transmitted from the WTP to the RWRD distribution system along a route that is approximately 3 miles long. The pipelines are anticipated to be installed in an open cut trench with an average depth of cover of about 5’. Trenchless installation techniques will be employed at crossings of major highways, railroads and creeks https://www.civcastusa.com/project/647e56161cb7c9ae673a77e5/summary vmadhavan@pape-dawson.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT