Access the Full Project by Clicking here!
Bidjugde
JOB
Secondary Water Line Street Resurfacing
BID DATE
06/14/23 - 2:00
AGENCY
North Salt Lake
ESTIMATE
n/a
SCOPE
Project consists of the installation of new secondary water lines in four cul-de-sacs off Eaglewood Loop in North Salt Lake. Installation of twenty (20) new water meters, and the transfer of outdoor water services from culinary water to the new secondary water meters on nineteen (19) existing homes. Approximately 60 LF of new french drain to collect known spring in one cul-de-sac, connecting to existing stub. Removal of all existing asphalt after completion of the water line work, with additional roadbase as required, finish grading of road, and 3" of new asphalt. Approximately 4,615 SY of pavement. karynb@nslcity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT