Access the Full Project by Clicking here!
Bidjugde
JOB
N7 Sawmill Az Pavement Repair
BID DATE
06/16/23 - 3:00
AGENCY
Navajo DOT
ESTIMATE
n/a
SCOPE
The existing asphalt shall be milled to 2” depth (approximately 700’ x 60’ per side). Milled asphalt shall be milled to 2” maximum size and shall be stockpiled within the Right of Way at project limits.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT