Hwy 84 Corridor Wastewater Improvements Phase 3 Contract B
BID DATE
06/29/23 - 2:00
AGENCY
Waco
ESTIMATE
n/a
SCOPE
The project includes the installation of 7,336 LF of 30-inch wastewater gravity main, 14 LF of 27-inch wastewater gravity main, 21 LF of 12-inch wastewater gravity line, 85 LF of 8-inch wastewater gravity main, 40 LF of 6-inch wastewater gravity main, 53 LF of 4-inch wastewater gravity main, 200 LF of 42-inch steel casing installed by bore, 75 LF of 42-inch casing installed by open cut, 31 LF of 16-inch relocated water line, manholes, a junction box, erosion controls, pavement repair, concrete trail removal and replacement, traffic control, project sign, bypass pumping, connections to existing wastewater system. https://www.civcastusa.com/project/6470ce7d03f30e2a89923d9e/summary daryleb@wacotx.gov