Access the Full Project by Clicking here!
Bidjugde
JOB
Denison Lake Texoma Raw Water Intake Pump Station Pipeline Package 7 Paving Site Restoration
BID DATE
06/15/23 - 1:00
AGENCY
Denison
ESTIMATE
n/a
SCOPE
This particular proposal package is for the concrete and asphalt paving shown throughout the plans. It includes gates and site restoration as noted. This project is for the construction of the new Intake Raw Water Pump Station (with Vertical Turbine Pumps) and associated components with 30 MGD initial capacity and ability to expand in the future to 50 MGD. The project also includes construction of approximately 6,750 LF of 42" raw water pipeline, approximately 1700 LF of 8" potable water line, approximately 8600 LF of 24" Potable Waterline, a 200' aerial crossing of the spillway, an access road, lake intake channel, outfall structure, site development, environmental mitigation, site security, electrical and installation of SCADA improvements. https://www.civcastusa.com/project/64625edb20ce880124118aeb/summary apettit@walshgroup.com
PREBID
6/1/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT