Access the Full Project by Clicking here!
Bidjugde
JOB
North Interceptor Wastewater Improvements Phase 1
BID DATE
07/25/23 - 2:00
AGENCY
Waco
ESTIMATE
n/a
SCOPE
The project generally consists of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place approximately 16,250 linear feet of 30- inch Hobas ASTM D3262 gravity wastewater line, 58 new manholes of various size and material, approximately 790 linear feet of bore and encased line using 48- inch & 54-inch steel casing pipe for two highway crossings and one UP railroad crossing, temporary by-pass system, abandonment of approximately 6,500 linear feet of existing 24-inch and 27-inch gravity wastewater lines and manholes, abandonment of two (2) existing lift stations, approximately 6,500 linear feet of 6- inch water line, surface replacement, road repair and all necessary components as shown on the project drawings and as specified herein. https://www.civcastusa.com/project/646646af03f30e9c25005559/summary daryleb@wacotx.gov
PREBID
5/24/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT