Access the Full Project by Clicking here!
Bidjugde
JOB
Sanitary Sewer CIPP Lining Twenty Second Congress
BID DATE
01/21/15 - 2:00
AGENCY
Pima County
ESTIMATE
$300,000
SCOPE
PLANHOLDER LIST ADDED: This project consists of furnishing all materials, equipment and supplies, and performing all labor in connection with the rehabilitation of a sanitary sewer and other work shown on Plan No. R-2013-124/G-2013-124, complete in place, in strict accordance with the Standard Specifications and Contract Documents, and these Special Provisions. Contractor shall perform entire rehabilitation project utilizing one lining technology. The rehabilitation work in this project shall include but not limited to: Flow Management Cleaning Cured-In-Place Pipe (CIPP) Pre-Construction and Post-Construction Close Circuit Television (CCTV) The rehabilitation consists of approximately 4,925 lineal feet of existing 8-inch vitrified clay (VC), asbestos cement (AC), ductile Iron (DI), and polyvinyl chloride (PVC) gravity sewer pipe. Approximately 147 lineal feet of existing 15-inch asbestos-cement gravity sewer pipe is to be rehabilitated. The approved trenchless technology for this specific job is installation of cured-in-place pipe (CIPP). Six (6) manholes are to be rehabilitated. Two (2) manholes are to be replaced with new manholes.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT