Access the Full Project by Clicking here!
Bidjugde
JOB
Traffic Signal Modification Boys Republic
BID DATE
06/22/23 - 2:00
AGENCY
Chino Hills
ESTIMATE
$282,000
SCOPE
The work comprises, but is not limited to, full-width pavement asphalt grind and overlay, reconstruction of ADA ramps, sidewalk, curb and gutter, cross gutter and spandrel, adjustment of manhole lids, diagonal crosswalk with concrete pavers and/or stamped asphalt concrete, and installation of pedestrian hybrid beacon signal head at intersection of Boys Republic Drive and City Hall Parking Lot. tcruz@chinohills.org engineering@chinohills.org https://www.chinohills.org/Bids.aspx?BidID=452

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT