Access the Full Project by Clicking here!
Bidjugde
JOB
Olmos Park Sanitary Sewer Bond Phase C
BID DATE
06/7/23 - 11:00
AGENCY
Olmos Park
ESTIMATE
n/a
SCOPE
The project bid package consists of a Base Bid and three Add Alternate Bids. The Base Bid scope of work includes pipe burst of 2,357 LF of lined 6-inch pipe, reconnect 45 sewer laterals, remove, and replace 7 manholes, rehabilitate 5 manholes, 1-point repair by open cut, and site restoration. The Add Alternate 1 scope of work includes pipe burst of 409 LF of lined 6-inch pipe, 1-point repair by open cut, remove and replace 1 manhole structure, rehabilitate 1 manhole structure, reconnect 4 sewer laterals, and site restoration. The Add Alternate 2 scope of work includes pipe burst of 339 LF of lined 6-inch pipe, reconnect 9 service laterals, rehabilitate 1 manhole, 3-point repairs, and site restoration. The Add Alternate 3 scope of work includes pipe burst of 348 LF of lined 6-inch pipe, reconnect 7 service laterals, rehabilitate 1 manhole, 1-point repair, and site restoration. https://www.civcastusa.com/project/645b8f9a9ab0e50f7532efde/summary martinez@givlerengineering.com
PREBID
5/26/2023 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT