Access the Full Project by Clicking here!
Bidjugde
JOB
Water Sewer For Fwcc Relocations Part 14
BID DATE
06/1/23 - 1:30
AGENCY
Fort Worth
ESTIMATE
n/a
SCOPE
The project includes: Relocation of an existing 66-inch sanitary sewer interceptor the installation of two double barrel inverted siphons by open shield pipejacking (approximately 850 linear feet of 45-inch/39-inch pipe in 60-inch steel casing and approximately 375 linear feet of 36-inch/30-inch pipe in 60-inch steel casing), installation of four water-tight shafts crossing beneath the existing West Fork Trinity River and future river bypass channel, a tunneled levee crossing with 84-inch steel casing, approximately 1,600 linear feet of 24-inch sanitary sewer line, bypass pumping, and various cast-in-place junction and siphon structures. Liam Conlon,817-392-6824,liam.conlon@fortworthtexas.gov https://www.fortworthtexas.gov/departments/finance/purchasing/bids/manual-bids/water/2023/104484
PREBID
4/24/2023 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT