Access the Full Project by Clicking here!
Bidjugde
JOB
Drainage Improvements Coulter Airfield Hangar 3
BID DATE
06/1/23 - 2:00
AGENCY
Bryan
ESTIMATE
n/a
SCOPE
Improve the storm drainage of the existing H3 Hangar at Coulter Air Field. This is to be accomplished by installing an 8” ACO Trench Drain on the North East side of the hangar adjacent to the building overhang. 8” storm pipes are to be connected to the proposed grate inlet along the east side of the hangar running to the existing trench grate located to the South West of the hangar. A 2’ x 2’ grate inlet will also be installed South of the hangar and connected the proposed storm pipes. The grass area on the South East side of the building will be regraded to the proposed grate inlet. Three 6” downspouts will be installed on the South East side of the building and connected to the proposed storm system. MAJOR PROJECT ITEMS - 1 - 8” ACO Trench Drain - 3 - 6” Downspouts - Minor Earthwork and Grading - 1 – 2’ x 2’ Grate Inlet - 8” storm pipe lperez@bryantx.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT