Industrial Park Drive Phase I Pavement Replacement
BID DATE
07/7/23 - 3:00
AGENCY
Nogales
ESTIMATE
n/a
SCOPE
This project consists in the replacement of the exisitng pavement on a segment of Industrial Park Drive Phase I , approximately 1804 feet , the project limits was broken into three alternatives to be able to reduce the scope of work in case of budget limitations . The proposed pavement crosssection is 36 feet wide with a layout of 7-inch asphalt concrete over 8” aggregate base course. The estimated asphalt pavement replacement area is 50,278 SF (5,587 SY). This project includes 9,680 of PCC (10” thick) over 4” of aggregate base course .This project will also include the adjustement of two existing water valves and the striping of the road per striping plans. jguerra@nogalesaz.gov