Access the Full Project by Clicking here!
Bidjugde
JOB
CDBG Wilmer Adams Street Water Main Improvements
BID DATE
05/18/23 - 12:00
AGENCY
Dallas County
ESTIMATE
n/a
SCOPE
replacement of existing water lines with 60 l.f. of 6-in., 1,780 l.f. of 8-in., and 60 l.f. 12-in. dia. PVC DR-18 Class 200 water main pipe and appurtenances including 3 fire hydrants and 16 Bullhead Tee 1-in. (8 Long and 8 Short) and 1 Long 1-in. residential water services with meter boxes all along Adams Street, from Miller Ferry Road to Dewberry Street. Approximately 33 residents shall be served in the City of Wilmer, County of Dallas, Texas, and in District No. 3. Includes 160 l.f. 16-in. dia. bore with 16-in. thick steel encasement pipe under Union Pacific Rail Road (U.P.R.R.) and Miller Ferry Road Right-Of-Ways. City is acquiring the U.P.R.R. Utility Bore Permit. Removal and replacement of the existing paving to construct the water mains - concrete apron, curb and gutter, driveways, and sidewalk, and asphalt including Cement Treated Base material is required. marvin.kines@dallascounty.org https://www.bidsync.com/bidsync-app-web/vendor/links/BidDetail.xhtml?bidid=2115979&returnPage=searchResults
PREBID
5/9/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT