Access the Full Project by Clicking here!
Bidjugde
JOB
Westside Boulevard Phase II - Bridge Improvements
BID DATE
01/22/15 - 9:00
AGENCY
Rio Rancho
ESTIMATE
n/a
SCOPE
Work generally consists of completing the widening of Westside Boulevard from a 2 lane undivided roadway section to a 4 lane divided roadway section at the Black Arroyo East Branch Channel, a distance of approximately 1,000 feet. A bridge with wingwalls for eastbound lanes will be constructed and pavement will be installed for eastbound lanes approximately 800 feet west of the East Branch Channel and approximately 200’ east of the East Branch Channel in order to complete the full 4-lane roadway section. The improvements also include turnouts for AMAFCA access to the Black Dam Water Quality Facility, bike lanes, curb and gutter, sidewalk east of the bridge, and signing and striping modifications from the City of Rio Rancho city limits to Golf Course Road. Existing storm drain west of the bridge will be relocated as part of this project with a pipe penetration into the existing shotcrete lined Black Arroyo. The scope of Bid Lot 1 is entirely within the City of Albuquerque and all City of Albuquerque rules and regulations shall apply

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT