Access the Full Project by Clicking here!
Bidjugde
JOB
FY 22 23 Pavement Rehabilitation
BID DATE
05/16/23 - 11:00
AGENCY
El Segundo
ESTIMATE
n/a
SCOPE
As described in the Bidding Documents, the bids are for a public works project (“Project”) which consists of traffic control, centerline-tie surveying and tie replacement if removed, tree root dig-outs, asphalt repairs, asphalt cold milling, hot mix asphalt paving, sewer and storm drain manhole-cover adjusting, water system valve-cover adjusting, clearing and grubbing for slurry seal, crack sealing, mechanically removing striping in slurry seal areas, protecting manhole, valve covers, or concrete areas from slurry seal, slurry seal Type II resurfacing, dust control, street sweeping, thermoplastic re-striping, reinstalling pavement markings, and related work. https://www.elsegundo.org/Home/Components/RFP/RFP/156/268895 purchasing@elsegundo.org
PREBID
5/2/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT