Access the Full Project by Clicking here!
Bidjugde
JOB
RFB 4793 Citywide Wastewater IDIQ FY2023
BID DATE
06/7/23 - 2:00
AGENCY
Corpus Christi
ESTIMATE
$8,100,000
SCOPE
The Scope of Work incudes: 1. The project is an Indefinite Delivery Indefinite Quantity (IDIQ) construction contract to complete wastewater collection system infrastructure construction at various locations throughout the City. The work will be issued by the City in multiple indefinite quantity individual work orders called “Delivery Orders” that provide specific scope and requirements in accordance with the plans, specifications, and contract documents. This is a “not to exceed’ contract and may only issue as many Delivery Orders as there is funding to cover. 2. The scope of work includes rehabilitation, replacement, and/or point repair of gravity wastewater collection system lines, manholes/structures, service laterals, and force mains using open-cut trenching and/or pipe bursting for lines up to 42-inches in diameter. 3. Work includes dewatering through well pointing, control of wastewater flow through bypass pumping, cleaning, and televised inspection of pipelines, as needed SWPPP/permit compliance (subsidiary), temporary traffic controls, and site restoration to pre-existing or better conditions. 4. Work includes emergency response Delivery Orders that require Contractor to always have management personnel and crews available and on-call during the Contract to provide emergency response on-call services. Refer to Section 01 35 00, “Special Procedures” for details. 5. The contract will have an initial duration of one (1) year not to exceed $8,100,000, subject to satisfactory contractor performance. Two optional one (1) year extensions with an additional $8,100,000 (for a total contract value over three (3) years of $24,300,000) may be issued subject to availability of funding and satisfactory contractor performance. 6. Each Delivery Order shall be treated as an individual contract and be completed within the stipulated substantial completion days in each DO document. Refer to contract documents, plans and specifications for additional information. https://www.civcastusa.com/project/644fe140d5a8a4537d1ccdcf/summary

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT