Access the Full Project by Clicking here!
Bidjugde
JOB
Arrow Boulevard At Tokay Avenue Traffic Signal
BID DATE
05/11/23 - 2:00
AGENCY
Fontana
ESTIMATE
$979,804
SCOPE
Hardscape and tree removals; existing pavement grind and overlay; Utility adjustments and relocations; construction of AC pavement, AC access ramps, curb return access ramp, and AC dikes; installation of traffic signal and lighting poles, mast arms, fiber optic interconnect, emergency vehicle detectors, control assemblies, pull boxes, pole foundations, underground conduit, and signing and striping; restoration of all existing improvements to pre-construction conditions; and all related work required to construct the improvements as indicated on the project plans for the ARROW BOULEVARD AT TOKAY AVENUE TRAFFIC SIGNAL PROJECT. Sid Lambert,909-350-7678,slambert@fontana.org https://pbsystem.planetbids.com/portal/14391/bo/bo-detail/105031#bidInformation

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT