Water System Upgrades Phases 1 2 3
BID DATE
07/11/23 - 3:00
AGENCY
Maricopa Domestic WID
ESTIMATE
n/a
SCOPE
The project is intended to be Bid in 3 phases. Phase 1 includes (2) Storage tanks, hydropneumatic tank, liquid chlorinator, booster stations, well equipping, 9,950 lf 6-inch PVC transmission main, Phase 2 includes 23,500 4-inch & 25,200 lf of 6-inch PVC distribution waterline, Phase 3 includes well equipping, tablet chlorinator, 16,900 lf 4-inch PVC transmission main and distribution waterlines, all with related appurtenances. dmiller@westlandresources.com 520-206-9585 cmcmillan@westlandresources.com