ADA Curb Ramp Improvements Phase 3
BID DATE
06/6/23 - 2:00
AGENCY
Humboldt County
ESTIMATE
$1,497,287
SCOPE
The work to be done consists of traffic control system, roadway excavation, hot mix asphalt for shared pathways, concrete curb ramps and infill sidewalk, detectable warning surfaces, structure excavation, thermoplastic striping and markings, roadway signs, drainage inlets, water meter & valve boxes, traffic signal boxes. Bidders are advised that the work must be completed within 100 working days. PWEngineering@co.humboldt.ca.us https://humboldtgov.org/Bids.aspx?BidID=490