Access the Full Project by Clicking here!
Bidjugde
JOB
Fiscal Year 2022 23 Street Repair Resurfacing
BID DATE
05/25/23 - 2:00
AGENCY
Oakley
ESTIMATE
$4,000,000
SCOPE
Project includes but is not limited to: mobilization, traffic control, water pollution control program, surveying and construction layout, potholing, Hot Mix Asphalt (HMA), cold planing, off hauling and disposing of Sierracrete, roadway and retention basin excavation and grading, crack seal and slurry seal, ARAM cape seal, lowering and adjusting to finish grade utility facilities, traffic striping, hydroseeding, shoulder backing, clean-up, and various other items as specified in the Contract Documents.
UPDATES