Airport Taxiway South Apron Reconstruction Phase II
BID DATE
05/25/23 - 3:00
AGENCY
Buckeye
ESTIMATE
$1,200,020
SCOPE
This project will reconstruct and realign the southern taxiways consisting of approximately 12,000 square yards (SY) of asphalt concrete (AC) pavement. It should be noted that the southern taxiways are currently unnamed and as part of this project the parallel taxiway portion has been renamed to Taxiway ‘J’ while the southern connector to Taxiway ‘D3’. The existing AC pavement is experiencing varying degrees of distress and is in need of reconstruction from the subgrade up through the pavement surface. Per the information available on ADOT’s Airport Pavement Management System (APMS) web application, the 2017 Pavement Condition Index (PCI) for the taxiway was 49, and projected to decline to 38 by 2023, indicating that major rehabilitation is recommended for this pavement. The Taxiway & South Apron Reconstruction - Phase 1 project, completed in November 2020, included the reconstruction of the southern aircraft parking apron. The apron taxilane was realigned to meet Object Free Area clearance criteria and the reconstruction of Taxiway ‘J’ will continue on this new alignment. Currently the existing taxiway is not in line with the apron taxilane. Taxiway ‘D3’ will be shifted approximately 80 feet from its existing alignment to provide a straight path from Taxiway ‘J’ to the Runway ‘35’ threshold. The realignment of Taxiway ‘D3’ will require curved taxiway centerline markings to match back into Taxiway ‘A’ beyond Taxiway ‘H’, which is twice as wide as required by FAA standards, until such time that its width is corrected, and its centerline realigned. A new storm drain will serve the infield areas between Taxiway ‘J’ and the airport hangars and will outlet into a channel running parallel to Taxiway ‘J’. A new culvert will convey flows underneath Taxiway ‘D3’ from the infield area to the south. This project will install new LED taxiway edge lighting and airfield guidance signage to enhance pilot safety, along with new underground conduit infrastructure and upgrades in the Electrical Vault including providing a new constant current regulator (CCR). tstewart@buckeyeaz.gov https://www.buckeyeaz.gov/Home/Components/RFP/RFP/210/409
PREBID
5/11/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT