Runway 12R 30L Reconstruction Schedules I III Taxiway H Demolition Taxiway B2 Construction Schedule
BID DATE
06/1/23 - 2:15 REAL-TIME
AGENCY
PMGAA
ESTIMATE
n/a
SCOPE
Base and Alts: Coffman: Base- $9,206,253 Alt 1- $6,850,675 Alt 2- $19,108,113 Alt 3- $3,446,416 Pulice: Base- $8,811,653 Alt 1- $7,477,097 Alt 2- $21,204,244 Alt 3- $3,935,249 The Runway 12R-30L Reconstruction project (Schedules I-III) includes the reconstruction of the 7,255-foot portion of Runway 12R-30L between the previously reconstructed thresholds. In addition to the need of new runway concrete pavement, the intent of this project is to also fix the nonstandard transverse and longitudinal grades within the runway pavement and non-standard grades within the Runway Safety Area (RSA). This project will also include the following items: The Taxiway H Demolition and Taxiway B2 Construction (Schedules IV) project includes the demolition of Taxiway H and construction of new Taxiway B2 located between Runway 12R-30L and Taxiway B. This work includes installing new taxiway signs, taxiway edge lights, and drainage infrastructure. mwhilden@gatewayairport.com
UPDATES