Access the Full Project by Clicking here!
Bidjugde
JOB
Reconstruct Runway 3 21 Remove Taxiway A6 Construct Taxiway A3
BID DATE
04/27/23 - 1:00
AGENCY
Springerville
ESTIMATE
n/a
SCOPE
The intent of this project is the full reconstruction of a portion of Runway 3-21, the removal of existing out of commission Taxiway A6, and the construction of new connector Taxiway A3. Runway 3-21 currently consist of an 8,422 ft x 75 ft. wide asphalt runway with unpaved shoulders. This project involves the removal of 708 ft x 75 ft of the existing pavement located at the intersection of the cross-wind Runway 11-29, the regrading of the area, the construction of new runway pavement along the existing alignment, and the application of pavement markings. Taxiway A6 currently consists of an approximately 271 ft x 70 ft wide asphalt taxiway that has been decommissioned due to unsuitable surface conditions and geometry and was recommended for complete removal and regrading to allow for adequate drainage within the infields. Taxiway A3 is to be constructed as to connect existing Taxiway A to Runway 3-21 using an approximately 198 ft x 25 ft wide taxiway pavement section with the application of pavement markings and drainage structures. skienle@springervilleaz.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT