Access the Full Project by Clicking here!
Bidjugde
JOB
Water & Sewer for The FWCC Relocations Project
BID DATE
06/1/23 - 1:30
AGENCY
Fort Worth
ESTIMATE
n/a
SCOPE
The Fort Worth Central City Part 14 – Channel Segment C Sanitary Sewer Relocations Project will relocate existing sanitary sewer infrastructure to accommodate the proposed Fort Worth Central City Bypass Channel Segment C near downtown Fort Worth. The project includes the relocation of an existing 66-inch sanitary sewer interceptor the installation of two double barrel inverted siphons by open shield pipejacking (~850LF of 45”/39” in 60” steel casing and ~375LF of 36”/30” in 60” steel casing) as well as the installation of four water-tight shafts) crossing beneath the existing West Fork Trinity River and future river bypass channel. The project also includes a tunneled levee crossing with 84” steel casing, approximately 1,600 LF of 24-inch sanitary sewer line, bypass pumping, and various cast-in-place junction and siphon structures. https://www.fortworthtexas.gov/departments/finance/purchasing/bids/manual-bids/water/2023/104484
UPDATES