Access the Full Project by Clicking here!
Bidjugde
JOB
Cemetery Outfall and Houston Storm Drain
BID DATE
04/27/23 - 1:30
AGENCY
Fort Worth
ESTIMATE
n/a
SCOPE
Sealed bids for the construction of Cemetery Outfall and Houston St. Storm Drain – City Project GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: 650 SY Concrete Pavement Repair, Industrial 500 LF Pre-CCTV Inspection 844 LF Post-CCTV Inspection 12 LF 21” RCP, Class III 209 LF 30” RCP, Class III 279 LF 36 RCP, Class III 344 LF 4x4 Box Culvert 4 EA 4’ St https://www.fortworthtexas.gov/departments/finance/purchasing/bids/manual-bids/tranp/2023/103667-cemetery-outfall-strom-drain

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT