Access the Full Project by Clicking here!
Bidjugde
JOB
Robertson Community Center South Parking Lot Resurfacing Upgrades
BID DATE
05/16/23 - 2:00
AGENCY
Sacramento
ESTIMATE
$210,124
SCOPE
The scope of work consists of the removal and replacement of existing asphaltic (AC) pavement, including restriping of the entire parking area to meet the City of Sacramento Parking Regulation. Upgrade the accessible AC parking with concrete construction, including compliant striping and signage (one) van-accessible parking stall and one accessible parking stall. Upgrade existing on-site ramp to meet accessibility requirements, including cast-in-place truncated dome. Upgrade the existing on-site concrete walkway to meet accessible requirements. Place 10’ x 20’ trash enclosure concrete pad. Provide wayfinding signage. Upgrade public improvements at the Public Right of Way (curb, Gutter, and Sidewalk) along Silver Eagle Road to meet the City of Sacramento Standards. Upgrade two existing driveways to the City of Sacramento Standards T-21 sidewalk driveway. Upgrade existing 8” SD line to 15” PVC SDR-35. Kirsten Wise,916-808-4011,KWise@cityofsacramento.org https://pbsystem.planetbids.com/portal/15300/bo/bo-detail/104896#bidInformation
UPDATES