Access the Full Project by Clicking here!
Bidjugde
JOB
Mid Canal Storage
BID DATE
05/18/23 - 2:00
AGENCY
Palm Desert
ESTIMATE
$7,000,000
SCOPE
This project includes an in-line 728 acre-foot reservoir between Check Structure 11 and 14 (Mile Post 54.6 and Mile Post 59.5) at the mid-canal. The reservoir will be formed by removing the existing embankment between the existing lined canal with the original earthen canal section to form a single wide trapezoidal section. David Wilson,dwilson@cvwd.org ,760-398-2661 Ext. 2736 https://pbsystem.planetbids.com/portal/16339/bo/bo-detail/104917#bidInformation
PREBID
5/4/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT