Access the Full Project by Clicking here!
Bidjugde
JOB
Hillside Dr Rear Lot Drainage Old Oaks Dr Storm Sewer Improvements
BID DATE
05/5/23 - 2:00
AGENCY
Bryan
ESTIMATE
$2,881,000
SCOPE
• Demolition, erosion control, and storm water pollution prevention. • Removal and disposal of ~11,000 SY asphalt pavement. • Removal and disposal of ~2,200 SY concrete driveway pavement. • Removal and disposal of ~5,600 LF of concrete curb & gutter. • Removal and disposal of ~180 SY of concrete sidewalk pavement. • Removal and disposal of ~1,200 LF of storm sewer pipes and RCB culverts (all sizes) including structures. • Grout fill ~1,400 LF of existing storm sewer pipe (all sizes) to be abandoned in place. • Construction of ~4,630 LF of storm sewer pipes and RCB culverts, including all structures and Dura-Slot drains. • Construction of 120 LF of sanitary sewer, including all structures. • Construction of ~640 LF of waterline (all sizes), including services, valves and fittings. • Construction of ~12,800 SY of 6” concrete pavement, including reinforcement & treated subgrade. • Construction of ~5,700 LF of 6” monolithic curb. • Construction of ~2,000 SY pf 6” concrete driveway pavement, including reinforcement & treated subgrade. • Construction of ~180 SY of 4” concrete sidewalk pavement, including reinforcement. lperez@bryantx.gov https://brazosbid.ionwave.net/PublicDetail.aspx?bidID=2018&ret=OPEN&pg=0&bidNumber=&title=&type=&org=

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT