Access the Full Project by Clicking here!
Bidjugde
JOB
GCW19686A Mustang Reservoir Embankment Damages Repair Project
BID DATE
06/13/23 - 10:00
AGENCY
Gulf Coast Water Authority
ESTIMATE
n/a
SCOPE
The scope of work associated with the Contract Documents includes the following: raising and grading the perimeter ring levee system for Mustang Lake East and Lake West utilizing locally sourced and imported materials. Additional work items include constructing two concrete spillways, removing and replacing outfall structures, constructing four headwall structures, constructing closure structures, and placement of erosion protection. https://www.civcastusa.com/project/6421b7e505846b53326cfe60/summary SRajendran@gcwatx.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT