Midvale City 700 West Pipeline JVWCD Meter Station
BID DATE
04/27/23 - 5:00
AGENCY
Midvale
ESTIMATE
n/a
SCOPE
This project consists of the construction of roughly 1,597 feet of 20-inch diameter welded steel pipeline in 700 West from a connection at an existing JVWCD Valve Vault, located in the intersection of 700 West and Winchester Dr in Murray, Utah, to and including a new JVWCD Meter Station located near the intersection of 700 West and 6825 South. The project also includes about 936 feet of 20-inch diameter PVC pipe from the JVWCD Meter Station to a connection to the existing Midvale public water system at the intersection of 700 West and 6960 South. The JVWC Meter Station project includes installing the meter vault and associated piping and miscellaneous appurtenances, electrical and SCADA equipment and connections, ventilation system, and testing and commissioning the station. Susan Stengel +1 801-567-7254 sstengel@midvale.com