JOB
Water Distribution System Improvements
BID DATE
05/10/23 - 3:00
AGENCY
Roseville
ESTIMATE
n/a
SCOPE
This project is a result of that analysis, which identified three improvements in the City’s water distribution system that would increase reliability and address capacity limitations. It consists of these three new connections: New 8-inch trenchless waterline under Cirby Creek at Coloma Way to Coral Drive, New 8-inch waterline crossing Dry Creek at Douglas Boulevard (installed on existing bridge), and New 8-inch waterline connecting existing lines between Wayne Drive and South Harding Boulevard. Janice Gainey (916) 774-5535 JRGainey@roseville.ca.us