Access the Full Project by Clicking here!
Bidjugde
JOB
Bay Trail Vine Trail Gap Closure
BID DATE
05/31/23 - 2:00
AGENCY
Vallejo
ESTIMATE
n/a
SCOPE
Developing and implementing a water pollution program, temporary traffic control for street closures and detours, surveying and staking for proposed grades, remove and replace curb, gutter, sidewalk, driveway, and curb ramps, cold-milling removal of asphalt concrete, hot-mix asphalt paving, lowering, and raising of existing utilities, recycling disposed materials, installation of new drain inlets and piping, pavement striping, signage, and relocating utilities. Sam Kumar 707-648-4432 Sam.Kumar@cityofvallejo.net https://pbsystem.planetbids.com/portal/42510/bo/bo-detail/104178#bidInformation
UPDATES