Access the Full Project by Clicking here!
Bidjugde
JOB
Lone Star Parkway Town Creek Channel Stabilization Precinct 1
BID DATE
04/26/23 - 2:00
AGENCY
Montgomery County
ESTIMATE
n/a
SCOPE
This project along Town Creek at Lone Star Parkway, is 255 LF of creek channel. This 255 footlong project is an existing eroded channel with proposed revetment and erosion control measures, includes; 2,374 CY of channel excavation, 605 CY of embankment, 725 SY of cellulose fiber mulch seed, 1,662 CY of stone riprap, 20 LF of rock filter dam, 350 LF of silt fence and 4 construction exits. The scope of the project also consists of the following: Install construction exits per plans. Clear obstructing trees and prep the right of way, cleaning and removing any accumulated debris, and any objectionable material along the right of way, channel project length and site. Install temporary erosion and sediment control items per plans. Locate all buried utilities and determine their depths within the project limits. Realign existing eroded channel per plan sheets and with located utilities noted and any potential conflicts resolved, excavate channel and install embankment to conforming shape per cross sections. Remove refuse material from project site. purchasing@mctx.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT