Access the Full Project by Clicking here!
Bidjugde
JOB
Breckenridge TxDOT FM 3099 Realignment Utility Relocation RFP
BID DATE
04/14/23 - 10:00
AGENCY
Breckenridge
ESTIMATE
$550,000
SCOPE
The installation of approximately 3,200 LF of 4”, 6” and 8” HDPE water line at the intersection of FM 3099 and US 180 in Breckenridge, Texas. Bid A will include the installation of the proposed water line via bore, whereas Bid B will include the installation of the proposed water line via open cut unless otherwise specified. https://www.civcastusa.com/project/6420a838b743b537820a9476/summary sage.diller@e-ht.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT