Access the Full Project by Clicking here!
Bidjugde
JOB
Northgate Ranch Phase 3
BID DATE
04/19/23 - 11:00
AGENCY
Wylie
ESTIMATE
n/a
SCOPE
RCP Drainage Piping, including approximately 18”- 48” Pipe, Manholes and appurtenances, 8’x8’ RCB, Arch Pipe Bridge Structure; Water Piping, including 8” & 12” mains, valves and appurtenances; Wastewater Piping consisting of 8” Gravity Mains, and appurtenances, Pressure Pipe Wastewater System; Water Quality Improvements including seven detention pond; Excavation, Embankment and Paving; Subdivision Improvements including Sidewalk, Curb and Gutter, Signing and Striping and various other Improvements; Sedimentation and Erosion Control Improvements. https://www.civcastusa.com/project/641a28c64ab9f70de6002237/summary ileal@bgeinc.com
UPDATES