Westside IV Transmission Main Aledo Rd WSIV
BID DATE
04/20/23 - 1:30
AGENCY
Fort Worth
ESTIMATE
n/a
SCOPE
The major work will consist of the (approximate) following: 12,890 linear feet of 36-inch water line by open cut, 446 linear feet of 60/54-inch steel casing pipe or tunnel liner plate with 36-inch carrier pipe by other than open cut, and 90 linear feet of 24-inch water line by open cut. https://www.fortworthtexas.gov/departments/finance/purchasing/bids/manual-bids/water/2022/103292-3 Farida.Goderya@fortworthtexas.gov