Access the Full Project by Clicking here!
Bidjugde
JOB
Upper Reuse 24 Inch Pipeline Phase 2
BID DATE
04/6/23 - 10:00
AGENCY
Frisco
ESTIMATE
$5,700,000
SCOPE
The Work is generally described as follows: The construction of 6,175 linear feet of 24-inch PVC (AWWA C900, DR-18, Purple) or Ductile Iron (AWWA C151/A21.50, PC 200) pipe, and Fusible PVC (AWWA C900, DR-18, Purple) pipe, divided into two segments, Segment 1 and Segment 3. The reuse pipeline includes open cut, trenchless bore, and directional drilling installation. Segment 1 connects to an existing 24” reuse pipeline at the northwest corner of the Warren Sports Complex and travels east along Eldorado Pkwy before connecting to Segment 2. Segment 4 connects to the other end of Segment 2 and travels south along Hillcrest Rd before connecting to Segment 3 on the southwest corner of Main St and Hillcrest Rd. Segment 3 then travels west along Main St until turning south along City of Frisco property to connect to the rehabilitated ground storage tank at the Frisco No. 2 site. Bid opening information is in Project Manual. https://friscotexas.bonfirehub.com/opportunities/88629

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT