Joiner Parkway Pavement Rehab Phase 2
BID DATE
06/29/23 - 2:30
AGENCY
Lincoln
ESTIMATE
$1,663,600
SCOPE
The City of Lincoln has received funding from the Regional Surface Transportation Program (RSTP). It plans to rehabilitate Joiner Parkway from Moore Road to Third Street during the 2023 construction season. This roadway's current conditions show signs of pavement degradation, base failures, weathering, other pavement distress, drainage issues, and out-of-compliance ADA curb ramps. The proposed project will rehabilitate the roadway by performing full-depth reclamation with cement (FDR?C), correcting drainage issues by replacing some existing curb and gutter sections, upgrading all non-compliant ADA ramps across the area of Joiner Parkway, and replacing some minor concrete sidewalks. In addition, a pavement preservation treatment known as micro-surfacing will be placed from Moore Road to 108 Joiner Parkway (Joiner Pkwy Self Storage), and new traffic striping and pavement markings will be placed. https://pbsystem.planetbids.com/portal/48920/bo/bo-detail/106540 Edgar Garcia, edgar.garcia@lincolnca.gov
UPDATES