Access the Full Project by Clicking here!
Bidjugde
JOB
Paragon Skate Park Improvements (REBID)
BID DATE
11/2/23 - 1:00
AGENCY
Perris
ESTIMATE
$1,600,000
SCOPE
Deark E&C - $2,499,000 Solex Construction - $2,558,000 The Project consists of the removal of an existing modular skate park and replacement with a new custom built skate park at an existing park within the City of Perris. The existing Paragon Skate Park is a modular on grade system set on previous tennis courts. This will require the demolition and removal of all existing items and hardscape including, concrete, rebar and or reinforcement, lights, and footings. In addition, the existing lighting control and conduits from an adjacent basketball court shall be re-routed and supplied as needed to avoid new features. A sump and pump system will be installed to serve the drainage needs of the new skate park that includes concrete features such as below grade pools and bowls. The sump pump system will be tied to an existing drainage conveyance system. New solar lighting will be purchased and installed also as part of this project. Areas of artificial turf will be installed around specific skate features as called for by the plans. Minor grading, turf removal and replacement, as well as required adjustments to the existing irrigation system shall also be completed with a 90-day maintenance period included. https://activebidder.com/view-bid?id=64e7c1673d63033bee5d02ea
UPDATES