Red Oak Lane Phase I Paving Drainage Improvements
BID DATE
03/24/23 - 1:00
AGENCY
Wylie
ESTIMATE
n/a
SCOPE
The Red Oak Lane Phase I: Paving & Drainage Improvements project will consist of removal of approximately 168 LF of half street and curb-gutter along with a valley curb and existing pavement in the ROW of Red Oak. Existing pavement removed will be replaced based on the new grades established by the plans along with a new 24” concrete curb and gutter. One new 24’ wide concrete driveway will be provided with this construction. All paving will be HMAC except for the curb and the driveway. All work will occur within the ROW. https://www.civcastusa.com/project/640a3021d750e4ea8834fa45/summary ars@mjthomaseng.com