Access the Full Project by Clicking here!
Bidjugde
JOB
Calle Miramar Storm Drain Improvement I178 Apple Avenue Alley Storm Drain I150 172nd Street Storm D
BID DATE
04/12/23 - 3:00
AGENCY
Torrance
ESTIMATE
$1,200,000
SCOPE
The project will address drainage issues at three locations within the City. Calle Miramar Storm Drain Improvement Project, I-178: The scope of work includes the installation of two new storm drain catch basins and a new 18-inch RCP lateral approximately 770 feet in length on Calle Miramar on Calle Miramar between Via Sevilla and Via Colusa that will connect to the existing Los Angeles County Flood Control District 24-inch RCP storm drain at Via Sevilla. Apple Avenue Alley Storm Drain Installation, I-150: This scope of work includes removal and reconstruction of a concrete grated catch basin, installation of 92 feet of 15-inch reinforced concrete storm drain pipe that will connect to an existing 24” reinforced concrete storm drain pipe, and cold mill and overlay of asphalt pavement. 172nd Street Storm Drain Lining, I-192: The scope of work includes installation of storm drain liners for two 22”x36” eroded arched corrugated metal pipes approximately 192 feet in length total, removal and reconstruction of the concrete culvert top, and pipe cleaning. https://www.torranceca.gov/Home/Components/RFP/RFP/1570/1573 ccccccc JCaballero@TorranceCA.gov CityClerk@TorranceCA.gov
UPDATES