Access the Full Project by Clicking here!
Bidjugde
JOB
Dunlap Blvd Bridge Replacement Crossing Wilson Creek Channel Phase 2
BID DATE
04/6/23 - 3:00
AGENCY
Yucaipa
ESTIMATE
n/a
SCOPE
The contract work to be done shall consist of furnishing all labor, materials, necessary tools and equipment, supervision, appurtenances, and all utility and transportation services required for the construction of Dunlap Boulevard Bridge and Replacement Project Crossing Wilson Creek Channel – Phase 2. The project shall include, but are not limited to the following: Furnish and install structural steel on the bridge that was constructed as part of Phase 1. Removal of portions of the existing Dunlap Boulevard Culvert currently below the new precast concrete girder bridge structure that was constructed as part of Phase 1. Channel improvements consisting of fascia walls, reinforced concrete channel invert, warped wing walls, rip-rap channel, concrete cutoff walls, R&W Revetment, and concrete aprons. Associated street improvements (curb, gutter, curb ramps, embankments, storm drains, drainage inlets, driveway approaches, Modified Picket Fence Railing, Modified Picket Railing Double Drive Gate, AC paving, sidewalk, utilities, etc.) to connect the new bridge structure constructed in Phase 1 to the existing street improvements of Dunlap Boulevard and 14th Street. The bottom of the existing RCB culvert shall be protected in place and joined to the proposed reinforced concrete channel invert and bridge abutment/fascia wall. Landon Kern 909-797-2489 ext. 288 lkern@yucaipa.org dshortlidge@yucaipa.org
UPDATES